用户名: 密码: 验证码:
超高层混合结构施工阶段竖向变形与关键构件内力分析
详细信息    查看官网全文
摘要
考虑施工阶段结构时变特性、构件配筋以及施工找平的影响,对陕西延长石油科研中心大楼进行施工过程模拟,主要研究结构施工阶段竖向变形和关键构件内力的发展变化规律,并就关键问题给出解决建议,供同类项目参考。
Considering the time-varying characteristics of the structure during the construction stages and the influence of the components' reinforcement and construction leveling,the law of structural vertical deformation and the components' internal force was analyzed by making construction simulation for the building named Shaanxi Yan Chang Petroleum Scientific Research Center,and put forward solutions to solve the key issue,which had a reference value for the similar structures.
引文
[1]陈海洲,王玉岭,刘进贵,等.超高层钢结构建筑的施工模拟技术理论和方法[C]//全国建筑结构技术交流会.2011
    [2]辛力,王敏,曾凡生,等.延长石油科研中心超高层结构设计概述[J].中华建设,2013(5):84-87
    [3]王光远.论时变结构力学[J].土木工程学报,2000,33(6):105-108.
    [4]Midas分析手册Analyis&Design[M].北京迈达斯技术有限公司,2006.
    [5]傅学怡,高洪.钢筋混凝土柱收缩徐变分析[J].建筑结构学报,2008(S1):191-199.
    [6]Department for Communities and Local Government.Eurocode BS EN1992-1-1:2004:Design of Concrete Structures[S].
    [7]潘林,宋灿.施工期框架结构竖向变形差异及其影响[J].武汉理工大学学报,201 1,33(8):94-98.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700