摘要
本文以重庆轨道交通5号线大竹林停车场—重光站段区间为依托工程,建立梁-梁计算模型分析单护盾TBM在施工过程中的受力情况,该模型计算准确且更加方便提取接头内力,分析接头的受力情况,通过计算得到单护盾TBM接头结构的张开度,验算在施工荷载下接头结构防水也能满足要求。
This paper based on the Da zhu lin parking station~Chong guang station of Chong qing rail transit line 5engineering,we built the beam—beam numerical calculation model to analyze the influence on the TBM tunnel during the construction,and the model could be more accurate during calculation and was more convenient to extract the joint internal force,this paper analyzed the stress of the joints,single shield TBM joint structure's opening is obtained by the calculating,and we found out that the waterproof of the joint under construction load can meet the requirements.
引文
[1]程小虎.梁单元模拟管片接头的盾构衬砌计算模型[J].地下空间与工程学报,2010,(5):946-951.CHENG Xiaohu.Calculation Model of Shield Tunnel Segment with Joints Simulated by Beam Element[J].Chinese Journal of Underground Space and Engineering,2010,(5):946-951.
    [2]徐彬,李红.TBM辅助油缸推力下的衬砌管片受力分析[J]'合肥工业大学学报,2009,(10):1535-1537.XU Bin,LI Hong.Segmental mechanical analysis of TBM under pushing force of fuel tank[J].Journal of Hefei university of technology,2009,(10):1535-1537.
    [3]宋克志,袁大军,王梦恕.盾构法隧道施工阶段管片的力学分析[J].岩土力学,2008,29(3):619-623.SONG Kezhi,YUAN Dajun,WANG Mengshu.Segmental mechanical analysis of shield tunnel during construction stage[J].Rock and Soil Mechanics,2008,29(3):619-623.
    [4]朱合华,陶履彬.盾构隧道衬砌结构受力分析的梁-弹簧系统模型[J].岩土力学,1998,19(2):26-32.ZHU Hehua,TAO Lubin.Study on Two Beam-spring Models for the Numerical Analysis of Segments in Shield Tunnel[J].Rock and soil Mechanics,1998,19(2):26-32.
    [5]曾东洋,何川.盾构隧道衬砌结构内力计算方法的对比分析研究[J].地下空间与工程学报,2005,1(5):707-712.ZENG Dongyang,HE Chuan.Comparison and Analysis Research of Different Shield Tunnel Lining Internal Forces Design Methods[J].Chinese Journal of Underground Space and Engineering,2005,1(5):707-712.
    [6]石少刚.施工荷载下盾构隧道管片力学响应分析:(硕士论文).哈尔滨:哈尔滨工业大学,2014.SHI Shaogang.Study on mechanical response of shield tunnel segment under construction loads:(Dissertation for the Master's Degree in Engineering).Harbin:Harbin Institute of Technology,2014.
    [7]夏炜洋,何川,晏启祥,谢红强.高水压岩质盾构隧道施工期结构内力分析[J].岩石力学与工程学报,2007,(2):137-141.XIA Weiyang,HE Chuan,YAN Qixiang,XIE Hongqiang.Structural internal force analysis of rock shield tunnel under high water pressure during construction[J].Chinese Journal of Rock Mechanics and Engineering,2007,(2):137-141.
    [8]叶冠林,王吉云,王建华,桥本正.超大断面盾构隧道管片施工荷载现场监测研究[J].现代隧道技术,2010,(5):91-95.YE Guanlin,WANG Jiyun,WANG Jianhua,Hashimoto Tadashi.In-situ Monitoring of Construction Loading Acting upon Segments of a Super Large Shield Tunnel[J].Modern Tunnelling Technology,2010,(5):91-95.