用户名: 密码: 验证码:
基于Fuzzy-AHP的国际工程报价及模型应用
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Decision Making and Model Application of the International Projects Offered Based on the Fuzzy-AHP Comprehensive Evaluation
  • 作者:侯公羽 ; 李诚 ; 夏婷婷 ; 李芳 ; 荀芳 ; 喻凤英 ; 毕海滨
  • 英文作者:HOU Gong-yu~1,LI Cheng~2,XIA Ting-ting~3,LI Fang~1,XUN Fang~1, YU Feng-ying~1,BI Hai-bin~1 (1.School of Mechanics and Givil Engineer ing,China University of Mining & Technology,Beijing 100083, China) (2.China National Machinery IMP & EXP Corporation,Beijing 100037,China) (3.Energy Saving Technology CO LTD of Beijing University of Mining & Technology,Beijing 100083,China)
  • 关键词:国际工程 ; 报价决策 ; AHP层次分析法 ; FUZZY模糊综合评价
  • 英文关键词:International project;;pricing decision;;AHP;;fuzzy comprehensive evaluation
  • 中文刊名:SSJS
  • 英文刊名:Mathematics in Practice and Theory
  • 机构:中国矿业大学(北京)力学与建筑工程学院;中国机械进出口(集团)有限公司;北京矿大节能科技有限公司;
  • 出版日期:2013-07-23
  • 出版单位:数学的实践与认识
  • 年:2013
  • 期:v.43
  • 基金:中央高校基本科研业务费资助项目(2009KL02)
  • 语种:中文;
  • 页:SSJS201314020
  • 页数:6
  • CN:14
  • ISSN:11-2018/O1
  • 分类号:220-225
摘要
国际工程招投标是一种比较成熟、高级和规范化的国际贸易方式.为了在决定投标成功的各项关键因素上发挥出比竞争对手更加强大的优势,提出了利用层次分析法与模糊综合评价法相结合的报价决策模型.利用模型,在考虑到投标项目特有的影响因素前提下,选取合理的评价等级,可以模拟出具体项目的最优报价水平,为决策者做出最优报价决策、提高投标报价的成功率提供定量的辅助工具.
        International project bidding is a mature,senior and standardized way of the international trade.In order to express more advantages than competitors,on the key factors of those determine success in the bid,this paper puts forward a pricing decision model combining the Analytic Hierarchy Process and fuzzy comprehensive evaluation.Using this model, and considering the special factors of the bidding project,to select the reasonable evaluation level,can simulate the best price level of a specific project,and it provide deciders quantitative support tools to make the optimal bidding,and improve the success rate of bidding.
引文
[1]邱闯.国际工程合同原理与务实[M].中国建筑工业出版社,2002.
    [2]Chua D K H,Li D.Key factors in bid reasoning model[J].Journal of Construction Engineering and Management,2000,126(5):349-357.
    [3]Seung H.Han and James.Diekmann.Making a risk-based bid decision for overseas construction projects[J].Construction Management and Economics,2001(19):765-776.
    [4]Seydel John,Olson David L.Bids considering multiple criteria[J].Journal of Construction Engineering and Management,ASCE,1990(4):609-622.
    [5]郭金玉,张忠斌,孙庆云.层次分析法的研究与应用[J].中国安全科学学报,2008(5):148-153.
    [6]金菊良,魏一鸣,丁晶.基于改进层次分析法的模糊综合评价模型[J].水利学报,2004(3):65-70.
    [7]赵伏军,谢世勇,杨磊,陈世强.基于层次分析法-模糊综合评价(AHP-FCE)模型优化矿井通风系统的研究[J].中国安全科学学报,2006(4):91-96.
    [8]彭锟,强茂山.模糊层次分析法在Duber Khwar项目风险评价和投标决策中的应用研究[J].水利发电学报,2004(6):44-50.
    [9]赵莉勇,谢海平,国际工程报价中意外费用的模糊决策模型[J].天津工业大学学报,2001(12):34-36.
    [10]洪伟民,朱志伟.基于模糊AHP的国际工程项目投标风险评价[J].煤炭工程,2008(4):110-113.
    [11]孙忠强,王宝生,卢德梅.模糊层次分析法在国际工程项目投标中的应用[J].水利经济,2008(3):46-49.
    [12]郑永强,陈伯望.模糊层次分析法在工程招投标中的应用[J].湖南城市学院学报,2005(3):11-14.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700