考虑装配施工过程的整体预应力装配式板柱结构力学性能研究
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Study on mechanical properties of monolithic prestressing assembled slab-column building considering assembly process
  • 作者:张开臣 ; 王泽强 ; 杜彦凯 ; 张慧颖
  • 英文作者:Zhang Kaichen;Wang Zeqiang;Du Yankai;Zhang Huiying;Beijing Building Construction Research Institute Co., Ltd.;
  • 关键词:整体预应力装配 ; 板柱结构 ; 施工过程
  • 英文关键词:assembled by monolithic prestressing;;column-slab structure;;construction progress
  • 中文刊名:JCJG
  • 英文刊名:Building Structure
  • 机构:北京市建筑工程研究院有限责任公司;
  • 出版日期:2019-06-10
  • 出版单位:建筑结构
  • 年:2019
  • 期:v.49;No.503
  • 语种:中文;
  • 页:JCJG201911009
  • 页数:4
  • CN:11
  • ISSN:11-2833/TU
  • 分类号:57-60
摘要
介绍了整体预应力装配式板柱结构的基本力学原理,针对装配式结构体系的特点,采用有限元施工阶段模拟方法,研究了此类结构考虑装配施工过程的力学性能,着重研究了以下两个方面:对考虑装配施工过程的分析结果与"等同现浇"结构一次成型的分析结果进行偏差分析;对装配施工过程中边肋与明槽初始变形不协调导致的受力不均进行了分析。得出结论如下:整体预应力装配式板柱结构宜首选采用考虑装配施工过程的分析方法进行设计,宜考虑梁端刚域效果;当采用"等同现浇"方法进行分析设计时,明槽部分的内力或配筋应按比例调幅,调幅之后的内力或配筋应叠加到边肋中。
        The basic mechanical principle of the monolithic prestressed assembled slab-column structure was introduced. Based on the characteristics of the fabricated structural system, the finite element construction stage simulation method was used to study the mechanical properties analysis method of this type structure considering the assembly process. The following two aspects research were focused on: deviation analysis was carried out on the analysis result of considering the assembly construction process and the analysis result of the one-time forming of the "equivalent cast-in-place" structure; the uneven force was analyzed caused by the uncoordinated initial deformation of the edge rib and the open groove during assembly construction. The conclusions are as follows: the monolithic prestressed assembled slab-column structure should be first designed with the analysis method considering the assembly process, the beam end domain should be considered; when using the "equivalent cast-in-place" method for analysis and design, the internal force or reinforcement of the open groove part should be adjusted in proportion, and the internal force or reinforcement after the amplitude adjustment should be superimposed on the edge rib.
引文
[1] 朱张峰,郭正兴,汤磊,等.考虑不同预拉力的新型混合装配式混凝土剪力墙抗震性能试验[J].湖南大学学报(自然科学版),2015,42(11):41-48.
    [2] 舒欣,张奕.基于BIM技术的装配式建筑设计与建造研究[J].建筑结构,2018,48(23):123-126,91.
    [3] 张晋峰,孙彬,毛诗洋,等.装配式结构混凝土结合面粘结强度试验研究[J].建筑结构,2018,48(23):17-21,27.