矿山短期生产计划优化的多目标遗传粒子群算法
详细信息    查看全文 | 推荐本文 |
  • 英文篇名:Multi-objective Genetic Particle Swarm Optimization Algorithm for the Short-term Production Planning in a Mine
  • 作者:叶海旺 ; 欧阳枧 ; 李宁 ; 王李管 ; 雷涛 ; 王其洲
  • 英文作者:Ye Haiwang;Ouyang Jian;Li Ning;Wang Liguan;Lei Tao;Wang Qizhou;School of Resource and Environment Engineering,Wuhan University of Technology;Hubei Key Laboratory of Mineral Resources Processing and Environment;School of Resource and Safety Engineering,Central South University;
  • 关键词:露天矿山 ; 短期生产计划 ; 混合粒子群算法 ; 多目标优化模型
  • 英文关键词:Open-pit mine;;Short term production plan;;Hybrid particle swarm optimization algorithm;;Multi-objective optimization model
  • 中文刊名:JSKS
  • 英文刊名:Metal Mine
  • 机构:武汉理工大学资源与环境工程学院;矿物资源加工与环境湖北省重点实验室;中南大学资源与安全工程学院;
  • 出版日期:2018-11-15
  • 出版单位:金属矿山
  • 年:2018
  • 期:No.509
  • 基金:中央高校基本科研业务费专项(编号:2017IVA045,2017IVA046,2018-zy-085,2018IVB054);; 贵州省科技计划项目(编号:20172803)
  • 语种:中文;
  • 页:JSKS201811006
  • 页数:6
  • CN:11
  • ISSN:34-1055/TD
  • 分类号:31-36
摘要
针对露天矿山生产的基本特征及短期生产计划的编制要求,从露天矿山的品位及经济成本最小化的角度出发,构建了露天矿短期生产作业计划优化模型。以MATLAB软件为平台,采用遗传粒子群混合智能算法对模型进行求解。以某石灰石露天矿为工程背景进行研究,将研究结果与露天矿实际生产指标进行对比验证。结果表明:该模型适用于露天矿短期采掘作业生产计划的编制,优化结果保证了矿山生产作业出矿品位、出矿量及生产利润三者之间的平衡,有利于提高矿山的经济效益。
        In view of the basic characteristics of open-pit mine production and the requirements of short-term production plan,and in order to obtain the ore grade and the minimal economic cost of open-pit mines,an optimization model of shortterm production plan is established. Based on MATLAB software,the hybrid intelligent algorithm of genetic particle swarm optimization is used to solve the model. Taking a limestone open-pit mine as a case,the research results are compared with the actual production indexes of the open-pit mine. The results show that this model is suitable for making the plan of the shortterm mining production. The optimization results guarantee the balance among the three kinds of mine production indexes,including ore grade,ore output and production profit. As a result,this optimized model is helpful to increase the economic benefit of open-pit mine.
引文
[]王李管,陈鑫.数字矿山技术进展[J].中国有色金属学报,2016,26(08):1693-1710.Wang Liguan,Cheng Xin.Advancing technologies for digital mine[J].The Chinese Journal of Nonferrous Metals,2016,26(08):1693-1710.
    [2]Huang Junxin,Wang Liguan,Xiong Shumin.Circle geometric constraint model for open-pit mine ore-matching and its applications[J].Journal of Central South University,2012,19(9):2598-2603.
    [3]Wilke F L,Reiner T H.Optimizing the short-term production schedule for an open-pit iron ore mining operation[C]//Computer Methods for the 80's in the Mineral Industry.New York:Society of Mining Engineers,1979:642-646.
    [4]王李管,宋华强,毕林,等.基于目标规划的露天矿多元素配矿优化[J].东北大学学报:自然科学版,2017,38(7):1031-1036.Wang Liguan,Song Huaqiang,Bi Lin,et al.Optimization of open pit multi-element ore blending based on goal programming[J].Journal of Northeastern University:Natural Science,2017,38(7):1031-1036.
    [5]郑友毅,王青,顾晓薇.露天煤矿开采计划的整体动态优化[J].煤炭学报,2009,34(8):1052-1056.Zheng Youyi,Wang Qing,Gu Xiaowei.Overall dynamic optimization of production schedule in open-pit coal mines[J].Journal of China coal Society,2009,34(8):1052-1056.
    [6]Souza M J F,Coelho I M,Ribas S,et al.A hybrid heuristic algorithm for the open-pit-mining operational planning problem[J].European Journal of Operational Research,2010,207(2):1041-1051.
    [7]王青,任凤玉.采矿学[M].北京:冶金工业出版社,2011.Wang Qing,Reng Fengyu.Mining Science[M].Beijing:Metallurgical Industry Press,2011.
    [8]吴会江,李建祥.露天矿生产计划的现状、问题与对策[J].金属矿山,2005(04):4-6.Wu Huijiang Li jianxiang.Open-pit mine production planning:the current,problems&strategies[J].Metal Mine,2005(04):4-6.
    [9]李宁,叶海旺,吴浩,等.基于混合粒子群优化算法的矿山生产配矿[J].矿冶工程,2017,37(05):126-130.Li Ning,Ye Haiwang,Wu Hao,et al.Ore blending for mine production based on hybrid particle swarm optimization algorithm[J].Mining and Metallurgical Engineering,2017,37(05):126-130.
    [10]Ahmadi M R.Cutoff grade optimization in open pit mines using genetic algorithm[J].Resources Policy,2018,55:184-191.11
    [11]孙效玉,邓鹏宏,赵明.多时段露天矿生产计划整体优化模型[J].东北大学学报:自然科学版,2016,37(10):1460-1464.Sun Xiaoyu,Deng Penghong,Zhao Ming.Integrated optimization model of multi-period open-pit mine production scheduling[J].Journal of Northeastern University:Natural Science,2016,37(10):1460-1464.
    [12]李国清,李宝,胡乃联,等.地下金属矿山采掘作业计划优化模型[J].工程科学学报,2017,39(03):342-348.Li Guoqing,Li Bao,Hu Nailian,et al.Optimization model of mining operation scheduling for underground metal mines[J].Chinese Journal of Engineering,2017,39(03):342-348.
    [13]李瑞,胡乃联,李国清,等.基于多目标0-1规划的采掘作业计划优化[J].金属矿山,2017(02):102-108.Li Rui,Hu Nailian,Li Guoqing,et al.Optimization of mining operation plan based on multi-objective 0-1 programming[J].Metal Mine,2017(02):102-108.
    [14]Shiv Prakash Upadhyay,Hooman Askari Nasab.Simulation and optimization approach for uncertainty-based short-term planning inopen pit mines[J].International Journal of Mining Science and Technology,2018(2):153-166.
    15]徐少游,毕林,王李管.基于DIMINE软件的地下金属矿山生产计划编制系统[J].金属矿山,2010(11):51-55.Xu Shaoyou,Bi Lin,Wang Liguan.Production scheduling system of underground metal mine based on DIMINE software[J].Metal Mine,2010(11):51-55.
    16]胡乃联,李勇,李国清,等.用粒子群算法优化编制露天矿生产作业计划[J].北京科技大学学报,2013,35(04):537-543.Hu Nailian,Li Yong,Li Guoqing,et al.Optimization of open-pitmining operational planning by using a particle swarm algorithm[J].Journal of University of Science and Technology Beijing,2013,35(04):537-543.
    17]明图章,胡光伟,黄卫.大跨径钢桥面铺装体系多目标优化设计[J].土木工程学报,2007(02):70-73.Ming Tuzhang,Hu Guangwei,Huang Wei.Multiple-objective optimum design of pavement system for long-span steel bridges[J].China Civil Engineering Journal,2007(02):70-73.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700