摘要
针对200 t/h大型干熄焦装置一次除尘器冷却套管在生产运行中经常发生泄漏的问题,文章通过对冷却套管的内部结构形式、循环水水质情况和生产工艺操作等方面的分析,得出造成冷却套管泄漏的主要原因,并提出优化和改进措施,以达到延长冷却套管使用周期的目的。
In this paper,the main causes for leakage of cooling jacket are found out through analyzing the inner structural style of cooling jacket,quality of circulating water,production process and operation aiming at the problem that the cooling jacket of first dust remover for 200 t/h large coke dry quenching device often leaks in production run. Moreover,the optimization and improvement measures are proposed to extend its service cycle.