Two areas of high tidal stream exergy are identified in the Ria de Vigo region.
The energy output of two TEC farms, based on different turbines, is estimated.
15% of the 22.5 MW hourly extractable power per site can be tapped by the farms.
The estimated power output is between 2091 kW and 3146 kW.
Depending on the used TEC, the farms can feed between 4411 and 6638 Spanish homes.