用户名: 密码: 验证码:
Analysis of the optimal deployment location for tidal energy converters in the mesotidal Ria de Vigo (NW Spain)
详细信息    查看全文
文摘

Two areas of high tidal stream exergy are identified in the Ria de Vigo region.

The energy output of two TEC farms, based on different turbines, is estimated.

15% of the 22.5 MW hourly extractable power per site can be tapped by the farms.

The estimated power output is between 2091 kW and 3146 kW.

Depending on the used TEC, the farms can feed between 4411 and 6638 Spanish homes.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700