Hydrogeological Conditions of a Hydropower Station in the Middle Yellow River and Its Impact on the Construction of Reinforcement of the Station
详细信息   
摘要
Based on the study of regional geological structure,hydrogeological condition,water-pressure test,years of groundwater monitoring information and seepage field,it is found that the influence of karst confined water is the key engineering geological problem in the project area.Furthermore,permeability coefficient and ground water level of each formation is determined,and measures for confined water which may affect the construction of reinforcement are proposed.