Fozichong Pb-Zn deposit in Guangxi is located at the east side of southern part of Qin-Hang metallogenic belt. The main part of Pb-Zn deposit is controlled by NNE trending structural belt, and the ore body is extended along NNE direction. After summarizing the achievements from crisis mine forecasting project of the deposit, crisis mine exploration project and detailed survey of mine project, and analyzing characteristics of geologic minerals and metallogenic regularity, the prospecting model of Fozichong Pb-Zn ore field is established, and the prospecting potential in this ore field is defined. Moreover, through crisis mine forecasting and exploration project, the incremental productivity of Pb and Zn in Fozichong Pb-Zn ore field has reached hundred thousands of tons.