用户名: 密码: 验证码:
A New Method of Reservoir Stochastic Modeling Constrained by Seismic Data: A Case Study of J1s22 Formation of Zh1 Block in Junggar Basin, China
详细信息   
摘要
///As a case study of ZH-1 block in Zhunggar basin, a new method of multistep constraint stochastic modeling was presented, which integrates together geology, well logging and seismic data. The multistep modeling method can properly solve the problem that simulation target value and restriction value have no perfect relations, for example, facies and impedance. The method of multistep modeling has three steps. Firstly, the random field of typical geophysics curve, constrained by impedance data, is built by Collocated Cokriging simulation. Secondly, based on the geophysics curve field realizations the facies models are built. Finally the reservoir parameters model is built using Sequential Gauss simulation, constrained by the reasonable facies model which is picked through facies simulation realization analysis. This method has good performance in the phase of pre-development.

© 2004-2018 中国地质图书馆版权所有 京ICP备05064691号 京公网安备11010802017129号

地址:北京市海淀区学院路29号 邮编:100083

电话:办公室:(+86 10)66554848;文献借阅、咨询服务、科技查新:66554700